Search Catalog
      GO   
 All Categories    CNC Machining & Assembly of Titanium and Stainless Steel Engine Mounts
All Categories > Portfolios > CNC Machining & Assembly of Titanium and Stainless Steel Engine Mounts  

CNC Machining & Assembly of Titanium and Stainless Steel Engine Mounts


    border="0" Printable Page  
    Email Email This Page  
    Save To Favorites Save To Favorites
  

When Lockheed Martin procurement and manufacturing fell out of sync they turned to Lx3 Corporation to meet critical deadline. With BF-1 roll out to Marine Corps just weeks away, Lx3 was given task to expedite manufacture of required components. These components included Aft Thrust Mount Clamp assemblies, Aft Side Link Assembly and Fwd Side Link Assembly. These assemblies were required install engine into the very first STOVL (Short Takeoff Vertical Landing) F-35 to be manufactured.

Materials used were 6Al-4V Titanium and 13-8 MO PH Stainless steels with all inspections and coatings applied to flight critical specifications. Lx3 performed all machining and assembly operations in house and coordinated outsourcing of all additional required processes.

Completing all assemblies on schedule and fulfilling all specified LMA, AMS, and AS standards as indicated in our customer supplied drawings, LX3 exceeded our client's high expectations for service and quality. We even received the "Outstanding Manufacturing Support for JSF Program" award for a job well-done!






CNC Machining & Assembly of Engine Mounts Project Highlights

Product Description

Engine Mount Assemblies for BF-1 F-35 STOVL (Short Takeoff Vertical Landing) Application

Capabilities Applied/Processes

CNC milling
CNC Turning

Thread Rolling Per AS8879

Beta Annealing
  • 4Al-6V Titanium Beta Annealed Per AMS-H-81200A & LMA-M5004B. 3
  • Included Micro, Tensile and Fracture Testing of Material

Heat Treatment
  • 13-8 MO Stainless Steel Heat Treated to H1000 Per AMS 5629D
  • Included Tensile Testing of Material

Coating
  • 6Al-4V Ti - Penetrant Inspect, Conversion Coating and Solid Film Lube
  • 13-8 MO CRES - Solid Film Lube and Coatings as Indicated

Assembly
  • Nitronic 60 bushings installed in CRES Links and Swing Bolts Per LMA-PB033
  • Bushing ID's Machined to Required Tolerance.
  • CRES Pins Installed in Clamp Assemblies Per LMA-PB033 Shrink Fit Method
  • Pins Swaged Per LMA-PB023.
  • Spherical Bearings Installed and Swaged in FWD Side Link Assy.

100% Inspection

Tightest Tolerances

+/- 0.0002"

Material Used

13-8 MO PH Stainless Steel
6Al-4V Titanium

Components

Aft Side Link Assembly
Aft Thrust Mount Clamp Assemblies

Forward Side Link Assembly

In Process Testing Performed

CMM probing
Dimensional Inspection

Precision Measuring Instruments

Turnaround Time

4 week expedited service

Industry for Use

Military

Delivery Location

Lockheed Martin Aeronautics - Fort Worth, Texas

Standards Met

2D Auto CAD Drawing
All Specified LMA, AMS and AS Standards as Indicated in Customer Supplied Drawings

Customer supplied print

Product Name

F-35 Engine Mounts


 MORE IMAGES 

·  Components For Aft Side Link Assemblies Ready For Final Assembly. Material is 13-8 MO Stainless Steel.

·  Components for Fwd Side Link Assemblies Ready for Final Assembly. Material is 13-8 MO Stainless Steel.

·  Completed JSF BF-1 Engine Mount Hardware Ready for Install.

·  BF-1 F-35 Joint Strike Fighter Roll Out On Schedule!